Amount( in Lakh)Status of TenderAgreement Date & AmountAt Start of WorkIntermediate of Work At Completion of Work
Agenda No. Name of Work Item NameDivisionApproved by Administration Status of Invitation of Tender Status of Receipt of Tender Status of Execution of Tender Status of Work Allocation No. & DateAmount Status of Work Start View Photo Details Status of Work Complete View Photo Updated By Updation TimeStamp
WAB/HW/07/2022 A.E. work at Mahuli Marginal Right bund (i) Construction of 04 Nos Geo Bag stud in P.P. Rope gabion (6M x 9M) at interval of 30M c/c as well as Geo Bag toe in two row P.P. Rope Gabion with slope pitching by double layer of Geo bag between the studs and capping with Geo bag in U/S of existing protection work along river edge near 0.87 Km of Mahuli marginal Right Bundh. (ii) Restoration of only damaged portion of existing toe and slope protection of Mahuli Marginal Right Bundh and its extension up to Mahendra Raj Marg along original alignment keeping top of bundh 6.00M wide and side slope 2:1 in both R/S(river-side) and C/S(country-side) including provision of (3.6M x 1.00M) wide P.P. Rope gabion toe with double layer Geo bag pitching in R/S slope and turfing in C/S slope of Bundh. Head Works Division, Birpur16702000 Status - not updated View Status - not updated View Status - not updated View Status - not updated View    Status - not updated View Status - not updated View superadmin 10-03-2022 16:23:48
WAB/HW/06/2022 A.E. work at spur km. 8.50, km 7.65 & km 11.75 of WAB (i) Laying porcupine in three row with deflector at interval of 30m c/c in a length of 810M between spur 7.65 Km to 8.50 Km. (ii) Restoration of only damaged portion of Existing Toe and slope pitching by Geo bag in u/s of spur at K.M. 7.65 of WAB. (iii) Laying 150mm thick R.B.M. on Top of Spur at KM 7.65 and 8.50Km of WAB. (iv) Restoration of only damaged portion of U/S shank and nose apron of Spur at Km.11.75 of W.A.B. by crated boulder. Salvage boulder should be utilized. (v) Restoration of existing damaged portion of diagonal Porcupine with dampeners. (vi) Laying three row porcupine in between Existing stud no 04 to 12 in U/S of spur at Km 11.75 of WAB and Construction of 4 Nos. additional Geo bag stud @ 30M C/C in U/S of stud no 12.Head Works Division, Birpur19998000 Status - not updated View Status - not updated View Status - not updated View Status - not updated View    Status - not updated View Status - not updated View superadmin 10-03-2022 16:22:19
EAB/HW/05/2022 A.E. work at km 6.70 & km 9.45 of EAB Laying of two nos. three rows porcupine screen across Dh?r 30M apart with N.C. in front of front screen in 50M length each in U/S of 6.70 Km spur along with provision of two row porcupine along river edge in 100M length with deflector at 15M c/c in U/S of 6.70Km Spur. Restoration of two nos. old porcupine screen in length of 90M each in D/S of 9.45 Km Spur. Head Works Division, Birpur7923000 Status - not updated View Status - not updated View Status - not updated View Status - not updated View    Status - not updated View Status - not updated View superadmin 10-03-2022 16:20:52
EAB/HW/04/2022 A.E. work at km 3.77 to km 6.00 of EAB. (i) Laying Two No. three row porcupine screen in new active Dhar in U/S of 6.0 Km spur of EAB (Length- 125M) . (ii) Laying two nos. porcupine screen each consisting of three rows in U/S and D/S of 4.20 Km Spur in a length of 100M and 85M respectively.Head Works Division, Birpur16194000 Status - not updated View Status - not updated View Status - not updated View Status - not updated View    Status - not updated View Status - not updated View superadmin 10-03-2022 15:28:48
USB/HW/03/2022 A.E. work at U/S of Kosi Barrage at Golghar (RGB) Laying three row Porcupine Screen with deflector at interval of 30m c/c in U/S of R.G.B. of Kosi Barrage in a length of 250 M Head Works Division, Birpur5017000 Status - not updated View Status - not updated View Status - not updated View Status - not updated View    Status - not updated View Status - not updated View superadmin 10-03-2022 15:27:37
DSB/HW/02/2022 A.E. work at D/S of Kosi Barrage left guide bundh (LGB) (i) Restoration of only damaged portion of boulder stud no 3, 4, & 7 by Boulder crating. Salvage boulder should be utilized. (ii) Restoration of only damaged portion of Boulder Stud no 10 and 11 with back extension by Boulder crating. Salvage boulder should be utilized. (iii) Laying Porcupine in loop between stud no 07 to 11 and also in D/S of stud no 11 up to silt ejector Channel.Head Works Division, Birpur3995000 Status - not updated View Status - not updated View Status - not updated View Status - not updated View    Status - not updated View Status - not updated View superadmin 10-03-2022 13:59:27
DSB/HW/01/2022 A.E. work at D/S of Kosi Barrage right guide bundh (RGB) (i)Restoration of only damaged portion of Geo bag Stud No 1, 2, 3, 4, 8, 9, 10, 13, 14, 15, 19, 23, 25, 26, 27, 28, 29, Anchor no 1 & Anchor no. 2 as well as restoration of revetment work in D/S of stud no 29 to Anchor no 1 and anchor no 1 to Anchor no 2 (without protruding into the river) and provision of Geo bag capping in loop from stud no 01 to 29 and stud no 29 to anchor no 2. (ii) Restoration of only damaged portion of porcupine screen in off shoot channel in D/S of RGB of Kosi Barrage in length of 125 Meter. Head Works Division, Birpur7624000 Status - not updated View Status - not updated View Status - not updated View Status - not updated View    Status - not updated View Status - not updated View superadmin 10-03-2022 13:58:24